環(huán)氧地坪基面平整度超出范圍該如何解決

返回列表 來源: 瀏覽:91 發(fā)布日期:2018-11-01 10:41:30

如何解決環(huán)氧地坪基面平整度超出范圍?環(huán)氧地坪漆是地上的保護(hù)膜,它具有較高的附著力和負(fù)載性,并兼具強(qiáng)韌耐磨、憑據(jù)光亮、本錢經(jīng)濟(jì)、易清洗等有點。環(huán)氧地坪漆的厚度可所以0.5~5mm不等,相對于水泥混凝土幾面5~25cm是很薄的一層,所以它的耐壓和平坦性首要仍是依托混凝土基面。

How to solve the problem that the floor roughness of epoxy floor is out of range? Epoxy floor paint is a protective film on the ground, it has high adhesion and load resistance, and has both toughness and wear resistance, credentials bright, cost-effective, easy to clean and so on. The thickness of epoxy floor paint varies from 0.5 to 5 mm. It is a very thin layer compared with cement concrete, so its compressive strength and flatness are primarily dependent on the concrete base. 一般來說,做環(huán)氧環(huán)氧地坪漆需求基面平坦度在2m規(guī)模之內(nèi),選用2m的靠尺進(jìn)行丈量,而且落差不能超過2mm。

Generally speaking, the flatness of the base surface required for epoxy floor paint is within 2m scale, and 2m scale is selected for measurement, and the drop can not exceed 2m M.

假如地上平坦度達(dá)不到規(guī)范,請參閱以下幾點解決方案:

If flatness is not up to standard, please refer to the following solutions:

落差小于5mm

The drop is less than 5mm

1、打磨。運(yùn)用打磨機(jī),將最高點打磨與低點平行即可。

1, grinding. Use the grinding machine to polish the highest point parallel to the low point.

2、刮砂。環(huán)氧砂漿等厚型環(huán)氧地坪適用于這種辦法。在中涂施工時,在刮砂這道工序時,以環(huán)氧地坪漆與石英砂進(jìn)行混合,填充混凝土基面基面,完成找平的作用。

2, sand scraping. Epoxy mortar equal thickness flooring is suitable for this way. In the middle coating construction, in the sand scraping process, the floor paint and quartz sand are mixed, filling the concrete base surface, to complete the leveling effect.

落差大于5mm

The drop is greater than 5mm

假如基面落差大于5mm,就需要用打磨機(jī)進(jìn)行相片了,在落差在5mm以上的混凝土基面,從頭施工3-5cm的水泥砂漿層,從頭原漿收光,找平最佳。

If the base surface drop is greater than 5mm, it is necessary to use a grinder to take photos. On the concrete foundation with a drop of more than 5mm, the cement mortar layer of 3-5cm is constructed from scratch, and the light from scratch is collected to find the best leveling.


評論

  • 管理員剛剛

    暫無任何留言!

技術(shù)知識Classification

聯(lián)系我們
Contact Us

  • 無錫龍鼎地坪科技有限公司
  • 電 話:0510-88585862
  • 聯(lián)系人:范經(jīng)理
  • 手 機(jī):139-2116-5688
  • 郵 箱:[email protected]
  • 地 址:無錫市新區(qū)梅村工業(yè)園區(qū)